Sign In | Join Free | My benadorassociates.com
China GUANGDONG BTO NEW MATERIAL CO.,LTD. logo
GUANGDONG BTO NEW MATERIAL CO.,LTD.
Create the most cost-effective production base for coated color cardboard
Active Member

6 Years

Home > Flooring Protection Paper >

Builders 32x120" Floor Protection Paper Roll Dry Sheath Preventing Construction Delay

GUANGDONG BTO NEW MATERIAL CO.,LTD.
Contact Now

Builders 32x120" Floor Protection Paper Roll Dry Sheath Preventing Construction Delay

  • 1
  • 2

Brand Name : BTO

Model Number : CBL-05532120

Certification : FSC, SGS

Place of Origin : DongGuan, China

MOQ : 1 rolls (A4 size free sample)

Price : Negotiation

Payment Terms : T/T

Supply Ability : 10000 rolls per day

Delivery Time : 1week

Packaging Details : 25rolls/pallet

Description : Quality Cover Floors Cardboard

Performance : Price of Paint Protective Board

Specifications : 0.82*36.6m

Material : Shield Masonite Floor Protection Manufactures

Application : Building decoration and construction

Purpose : Prevent construction damage and delay

Contact Now

Builder'S 32''*120'Dry Floor Paper Sheath, Builder'S Floor Protection Paper Roll

The temporary floor protective cardboard can not only shield low-level traffic, but also provide a barrier for many materials commonly used in construction projects. Water, paint and external debris, such as mud and dirt, are away from the existing floor and reduce a lot of time to clean up after a project is completed. The combination of anti-skid design and spill protection technology provides an effective solution for trading paper customers to minimize the impact on existing surfaces that require high requirements for construction projects.

Builders 32x120" Floor Protection Paper Roll Dry Sheath Preventing Construction Delay

This floor protection paper is large enough for several items, flexible and easy to use. He is an excellent helper for floor protection, which helps to protect the floor and surface from small paint spills and splashes. It is also a major product in the paint and construction industries, providing temporary floor protection.

The main features are durability and multi-purpose. The floor protector paper is heavy enough to protect your floor from the most lasting wear and tear. It can be easily cut and used when necessary.

Builders 32x120" Floor Protection Paper Roll Dry Sheath Preventing Construction Delay

Features and benefits

  • Protection against abuse: protection from impact, rubbing, dogs, children and contractors
  • Anti overflow: prevent water, mud, paint and stains
  • Reusable: it can be used for dozens of different types of projects and will last for many years
  • Recycled / recyclable: made of recycled materials: recyclable at the end of useful life
  • Air permeability: newly created flexible fibers allow new concrete or wood surfaces to heal properly
  • Waterproof: made of recycled pulp, with fiber, water and ink waterproof surface.
  • Safety: non toxic, zero volatile organic compounds, no odor
  • Convenience: roll in 32 "wide x 120" long x 1 mm thick, easy to cut with box knife and tape with RAM tape.
  • Parapet: allows you to easily crease the BTO board to protect the wall and base molding
  • Save your investment: protect your beautiful floor, save your money and worry.
Available colors natural
Recyclable yes
Reusable yes
Material type paper
ventilation yes
an adhesive no
Liquid resistance yes
Flame retardant no

Builders 32x120" Floor Protection Paper Roll Dry Sheath Preventing Construction Delay

In any construction project, one of the most important preventive measures is to ensure that the finished product area remains in the best condition. Between the equipment, materials and pedestrian traffic involved in the building, the floor of the building is at risk of major damage. From large commercial projects to medium-sized renovation, almost all construction projects need temporary floor protection to avoid scratches and stains.

Our heavy-duty flooring is installed quickly to protect the floor surface from paint, mud, water, driving machinery, pedestrian traffic, blunt impact, and so on. It is reusable and allows the contractor to easily get the maximum from the floor. After the construction project is completed, just scroll and store the board until it is needed again.

Thanks & Regards!

BTO / Kary
Dong Guan Bto Environmental Protection Material Co.,Ltd
Add: 1, No.5 Jinsha Rd. Zhupingsha, Wangniudun, Dongguan, Guangdong, China
Cell/Wechat/WhatsApp: 0086 13728826316
Email: btoholding@yeah.net
www.btoepm.com

Product Tags:

120inches Floor Protection Paper Roll

      

Masonite Floor Protection Paper Roll

      

0.82m Flooring Protection Paper

      
Quality Builders 32x120" Floor Protection Paper Roll Dry Sheath Preventing Construction Delay for sale

Builders 32x120" Floor Protection Paper Roll Dry Sheath Preventing Construction Delay Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: GUANGDONG BTO NEW MATERIAL CO.,LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)